The order of the modernization work and where each step stands. Steps are lettered as in the original plan (February–March 2026). Statuses are as of October 2026; any marked [unverified] were not recorded anywhere recent and need John to confirm.

Step What Status
— SVN → Git, self-hosted Gitea ✅ Done
— Build process documented; Docker builds for front end and docs; Windows build VM exported and backed up ✅ Done
A1 E2E tests with Cypress 9.7.0, targeting remote devtest servers, with version validation and environment-based config [unverified]: the March notes listed it as both done and in progress
A2 Fix the outdated integration tests in raven-test-integration ✅ Done, March 2026: compiles on net8.0, broken tests removed or rewritten
A3 Data-list filter and sort integration tests ✅ Done, March 2026, together with Tier 1–3 gap coverage. February notes still called them stubs; the March notes supersede that [unverified]
— Fix the three server bugs the integration suite is waiting on: case 4653, case 4654, the contract issue Open
▶ .NET 10 port of the back end Current: NET10-PORT.md
B Git baseline: tag plus refactor branch [unverified]. The port's net8-baseline tag covers the tag half
C Architecture review Not started
D Refactor: remove redundant code, simplify, improve performance. No behaviour changes Not started
E Lower-level tests: unit and integration Not started
F Remaining dependency updates (see below) Back end: in progress as the .NET 10 port. Front end: not started
G New features, from the case database backlog Not started

Why the .NET 10 port comes before step D

It pulls the back-end half of step F forward. Sockeye, which shares most of this codebase, was ported first, so the work is mapped out and comes with a list of fixes found along the way. The integration suite from A2/A3 is the regression gate for it, as it will be for D.

Step F, front end (not part of the current port)

In this order, each step tested before the next:

  1. Remove fibers. It is optional for sass-loader; builds get a little slower
  2. Move Node from 12.22.9 to a current LTS
  3. Update the safe dependencies
  4. Vue 2 → Vue 3 and Vuetify 2 → Vuetify 3
  5. Webpack → Vite
  6. Optional: Options API → Composition API; TypeScript for new files only

Before step D starts

  1. The integration suite passes, apart from the three known server bugs
  2. Fix those three bugs
  3. Then refactor, letting the tests catch regressions