# Modernization roadmap The order of the modernization work and where each step stands. Steps are lettered as in the original plan (February–March 2026). Statuses are as of October 2026; any marked **[unverified]** were not recorded anywhere recent and need John to confirm. | Step | What | Status | |---|---|---| | — | SVN → Git, self-hosted Gitea | ✅ Done | | — | Build process documented; Docker builds for front end and docs; Windows build VM exported and backed up | ✅ Done | | A1 | E2E tests with Cypress 9.7.0, targeting remote devtest servers, with version validation and environment-based config | **[unverified]**: the March notes listed it as both done and in progress | | A2 | Fix the outdated integration tests in `raven-test-integration` | ✅ Done, March 2026: compiles on `net8.0`, broken tests removed or rewritten | | A3 | Data-list filter and sort integration tests | ✅ Done, March 2026, together with Tier 1–3 gap coverage. February notes still called them stubs; the March notes supersede that **[unverified]** | | — | Fix the three server bugs the integration suite is waiting on: case 4653, case 4654, the contract issue | Open | | ▶ | **.NET 10 port of the back end** | **Current**: `NET10-PORT.md` | | B | Git baseline: tag plus refactor branch | **[unverified]**. The port's `net8-baseline` tag covers the tag half | | C | Architecture review | Not started | | D | Refactor: remove redundant code, simplify, improve performance. No behaviour changes | Not started | | E | Lower-level tests: unit and integration | Not started | | F | Remaining dependency updates (see below) | Back end: in progress as the .NET 10 port. Front end: not started | | G | New features, from the case database backlog | Not started | ## Why the .NET 10 port comes before step D It pulls the back-end half of step F forward. Sockeye, which shares most of this codebase, was ported first, so the work is mapped out and comes with a list of fixes found along the way. The integration suite from A2/A3 is the regression gate for it, as it will be for D. ## Step F, front end (not part of the current port) In this order, each step tested before the next: 1. Remove `fibers`. It is optional for `sass-loader`; builds get a little slower 2. Move Node from 12.22.9 to a current LTS 3. Update the safe dependencies 4. Vue 2 → Vue 3 and Vuetify 2 → Vuetify 3 5. Webpack → Vite 6. Optional: Options API → Composition API; TypeScript for new files only ## Before step D starts 1. The integration suite passes, apart from the three known server bugs 2. Fix those three bugs 3. Then refactor, letting the tests catch regressions