@@ -19,9 +19,7 @@ CODING WORK
|
|||||||
+++++++++++
|
+++++++++++
|
||||||
|
|
||||||
Overall plan for now: anything standing in the way of making the initial client shell UI needs to be done first, everything else can wait
|
Overall plan for now: anything standing in the way of making the initial client shell UI needs to be done first, everything else can wait
|
||||||
- Audit log
|
- Audit log
|
||||||
- CRUD methods for widget
|
|
||||||
- replicate crud to other objects
|
|
||||||
- Route for retrieving as log format for reading (like reports: one for specific object id and type, one for user id as log of what they've been doing etc)
|
- Route for retrieving as log format for reading (like reports: one for specific object id and type, one for user id as log of what they've been doing etc)
|
||||||
- Test with huge dataset
|
- Test with huge dataset
|
||||||
- Localized text
|
- Localized text
|
||||||
@@ -57,6 +55,18 @@ Once I can make the client I need to get into that and make the shell and initia
|
|||||||
later
|
later
|
||||||
- Widget CRUD and lists
|
- Widget CRUD and lists
|
||||||
- All input controls and date localization etc etc
|
- All input controls and date localization etc etc
|
||||||
|
- LOAD TESTER see below...
|
||||||
|
|
||||||
|
LOAD TESTER
|
||||||
|
-----------
|
||||||
|
After very initial client stuff but before getting too deep into anything, need a load tester that drives the client and makes hundreds of thousands of objects and really exercises the client
|
||||||
|
and backend. I want to know what happens under typical heavy usage simulating months to years of work in just a few minutes.
|
||||||
|
I'm guessing something that autodrives a browser or simulates one to access via client UI for full end to end testing.
|
||||||
|
- Should be configurable to simulate various loads:
|
||||||
|
- Smoke test (Quick bug test): excercises one of everything once only looking for fundamental problems
|
||||||
|
- Load test (Slower longer test to look for scaling issues related to a huge, busy office): exercises typical daily load of very large office but configurable to run in simulated days, so
|
||||||
|
can run it as a simulated week with 7 or month with 30 or years by entering in the number of days to simulate. Would be nice if it did month end type stuff or delayed then billed out etc.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|||||||