Possible that a record may have only one or more of:
 - a start date/time
 - a stop date/time
 - a scheduled tech
 - a Est.Qty (i.e. 2 hours)
So still need to SHOW on the schedule so rest can be done (i.e. be able to assign, be able to estimate)


Need to be able to see on the Schedule xx different posibilities:

All Scheduled & Assigned LIST:
 
2. WOscheduled record  with Start date/time and Stop date/time, with Est. Qty, assigned to specific resource (all options are identified) (shows for the specific tech)

All Assigned LIST:

 
2. WOscheduled record  with Start date/time and Stop date/time, with Est. Qty, assigned to specific resource (all options are identified) (shows for the specific tech)
 
 
 
 6. WOscheduled record with NO Start date/time, with Est. Qty, assigned to specific resource (shows for specific tech only)

 Specific Tech LIST:
 
2. WOscheduled record  with Start date/time and Stop date/time, with Est. Qty, assigned to specific resource (all options are identified) (shows for the specific tech)
 6. WOscheduled record with NO Start date/time, with Est. Qty, assigned to specific resource 

Specific Tech - Not Scheduled LIST:

 
6. WOscheduled record with no Start date/time, with Est. Qty, assigned to specific resource (shows for specific tech only)
 
7. WOscheduled record with no Start date/time, with no Est. Qty,  assigned to specific resource (shows for specific tech only)

All Schduled LIST:

 
2. WOscheduled record  with Start date/time and Stop date/time, with Est. Qty, assigned to specific resource (all options are identified) (shows for the specific tech)

Seven scenerios of WHAT NEEDS to be able to be viewed ON Schedule:





Unassigned LIST too
And specific area of SCHEDULE below would show:
 

1. No WOScheduled records at all for this WO (no Est Qty, no Start Date/Time, no specific resource) (no options are identified)
 


3. WOscheduled record  with Start date/time and Stop date/time, with Est. Qty, but not assigned (shows in unassigned)

4. WOScheduled record  with no  Start date/time, with Est. Qty, not assigned (shows in unassigned AND not scheduled)

5. WOscheduled record with Start date/time, with Est. Qty, not assigned  (this can show in unassigned)

Unassigned section:
- if nothing ever unassigned, says so
- 
Previous / Next....for each view so that if viewing a specific date, know that there are other unassigns on different dates

Not Scheduled LIST:
 

1. No WOScheduled records at all for this WO (no Est Qty, no Start Date/Time, no specific resource) (no options are identified)
 
 


4. WOScheduled record  with no  Start date/time, with Est. Qty, not assigned (shows in unassigned AND not scheduled)