diff --git a/ayanova/devdocs/todo.txt b/ayanova/devdocs/todo.txt index a5dcb18d..15a261d7 100644 --- a/ayanova/devdocs/todo.txt +++ b/ayanova/devdocs/todo.txt @@ -1,4 +1,3 @@ - @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ @@@@@@@@@@@@@@@ ROADMAP STAGE 4 - REPORTING / DASHBOARD / KPI @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ @@ -6,7 +5,7 @@ REPORTING Procedure: - read all cases related to this + read notes in project including any related spec docs Look at existing reports in v7 and generalize them and the features provided that are used pdf, email, print, download @@ -17,8 +16,13 @@ Procedure: grid filter options and filter name must be an available field for report designer probably need a filter summarizer widget that can also be used inside the UI at the top of grids as well logo field with choice of size to correspond to the logo route + labels wtf? + notification needs to be able to generate reports and send them + Schedule form reporting + keep in mind, but ultimately it's probably a dedicated schedule thing test harness UI so can quickly test out things via widget list - research solutions online + + Once clear on needs, research solutions online This case has a lot of old research in it: https://rockfish.ayanova.com/default.htm#!/rfcaseEdit/3451 look at commercial ones just to steal ideas @@ -198,7 +202,10 @@ todo: First of all triage the features to port over in the sanest order so not s Try to get scheduleable stuff early because schedule form will take some time todo: Schedule form + - new gold standard is Google schedule so emulate that amap - This one is big but requires the data to be there so as soon as implement enough things that are scheduleable then do this + - printing / reporting + todo: Notifications Many are on hold until there are real objects to code against, now is the time to code them as the objects are added